Staff utilization

See per employee and working day what was booked – picks, packing, pallet and forklift rides – against their daily target time, with the gaps without any booking.

The staff utilization shows you per employee and working day what the system booked of their work and puts it next to their daily target time: picks, packed orders, pallet rides, forklift rides with ride time and the gaps in which nothing was booked. You see at a glance who books little compared to their target time – and you can ask specifically what happened in a gap.

Screenshot: Page "Staff utilization" with the table "Per employee" – target, present, active, idle, utilization, picks, packages and forklift rides per employee
Screenshot: Page "Staff utilization" with the table "Per employee" – target, present, active, idle, utilization, picks, packages and forklift rides per employee

Before you start

  • Maintain the Daily target time (Tagessollzeit) of your employees per weekday – see Employee assignment. Without a target time the page shows the bookings but no utilization.
  • Your user needs the permission Staff utilization (Mitarbeiter-Auslastung, WMS › Warehouse) – ask your administrator. Whoever may edit employee assignments has it automatically.
  • The page is there for the logistician only; clients see no employees.

Step by step

  1. Open WMS › Warehouse › Staff utilization (WMS › Lager › Mitarbeiter-Auslastung) – or click Staff utilization in the employee assignments.
  2. Under Period and employee (Zeitraum und Mitarbeiter) choose the period with From and Until (default: the last 7 days, at most 31 days), an Employee or All employees (Alle Mitarbeiter) and Idle from (minutes) (Leerlauf ab (Minuten), default: 10).
  3. Click Show (Anzeigen).
  4. The table Per employee (Je Mitarbeiter) shows the sums of the period. Clicking a name jumps to the working days of that employee.
  5. In the table of an employee, Rides (Fahrten) expands the forklift rides of the day, Gaps (Lücken) the stretches without a booking with what was booked before and after.
Screenshot: Working days of an employee with the gaps expanded – From, Until, Duration, Before and After
Screenshot: Working days of an employee with the gaps expanded – From, Until, Duration, Before and After

What the columns mean

Column Meaning
Days (Tage) Working days: days with at least one booking. A day without any booking counts as absent (holiday, sick, day off) and is left out – its target time as well.
Target (Soll) Daily target time of the working days, from the employee assignment.
Present (Anwesend) First to last booking of the day.
Active (Aktiv) Time between two bookings that is shorter than Idle from. During a forklift ride the time always counts as active.
Idle (Leerlauf) Stretches without a booking from Idle from minutes, their number in brackets.
Target without booking (Soll ohne Buchung) Target time before the first and after the last booking of the day – came earlier, left later or worked without booking.
Utilization (target) (Auslastung (Soll)) Active time in percent of the target time: green from 80 %, yellow from 60 %, red below.
Picks Picked lines; per day the number of picklists in brackets.
Orders packed, Packages (Aufträge gepackt, Pakete) Orders completed at the packing table and their packages; per day packages and boxes in brackets.
Pallet rides (Palettenfahrten) Pallets stored, replenished, transported and loaded.
Ø forklift ride, Ride time (Ø Staplerfahrt, Fahrzeit) Forklift rides (replenishment, transport) from taken over to done: average (number of rides with a duration in brackets) and sum.
Other (Sonstige) All other stock and order bookings of the employee.
Picklist change (Wechsel Pickliste) Typical time (median) from the last pick of a picklist to the first pick of the next.
Box change (Wechsel Box) Typical time (median) from the last packed order to the next box at the packing table.

Pick errors

The column Pick errors (Pickfehler) counts per employee the pick errors reported at the packing table for articles they picked (see Report pick errors). The card Pick errors lists every report of the period: Reported on, Picker, Type, Quantity, Item, Order, Picklist / box, Bin location, Reported by and Packing Table. If you choose one employee at the top, you only see their reports.

Screenshot: Card "Pick errors" with the reports of the week per picker
Screenshot: Card "Pick errors" with the reports of the week per picker

Forklift rides

A click on Rides (Fahrten) shows every ride of the day with Taken over (Übernommen), Done (Erledigt), Duration (Dauer), Type (Art, replenishment or transport), From spot (Von Platz), To location (Nach Platz) and Quantity (Menge). The times come from the log of the pallet rides.

Screenshot: Expanded forklift rides of a day with taken over, done, duration, type, from spot and to location
Screenshot: Expanded forklift rides of a day with taken over, done, duration, type, from spot and to location

Good to know / Troubleshooting

Message Cause Solution
The period ends before it begins. (Der Zeitraum endet vor seinem Beginn.) Until lies before From. Correct the date.
The period may be at most 31 days long. (Der Zeitraum darf höchstens 31 Tage lang sein.) The period is too long. Choose a shorter period.
A gap must be between 1 and 240 minutes. (Eine Lücke muss zwischen 1 und 240 Minuten liegen.) Idle from lies outside. Adjust the value.
There are no employee bookings and no target time in this period. (Im Zeitraum gibt es keine Buchungen von Mitarbeitern und keine gepflegte Sollzeit.) Nothing was booked in the period. Check the period or maintain target times.
  • No utilization, just a dash? No daily target time is maintained for the employee – the pen in the column Target leads straight to the assignment.
  • A forklift ride without duration? The ride was completed without being taken over first.
  • Other hours than in the dashboard or the monthly report? Those count clock hours with at least one booking; this page measures the time between the bookings.
  • Night shift? A day ends at midnight – a shift across midnight shows as two working days.